Early access is opening

Patients, meal plans, and progress, finally in one place.

Palato helps nutritionists and coaches manage patients, build meal plans, schedule visits, and track real progress. Join the waitlist for early access.

Early access. No spam. Unsubscribe anytime.

Built for nutritionists across LATAM.

Palato practice dashboard (preview)

Everything your practice needs, nothing it doesn't

Four simple pillars that replace the spreadsheets, chats, and sticky notes you juggle today.

Patients

One clinical record per patient: conditions, medications, allergies, preferences, and every measurement, always at hand.

Meal plans

One-month plans that start on any day, five meals a day on a weekly grid, built around each patient's allergies and tastes.

Progress

Weight and BMI trends, lab panels checked against reference ranges, and full anthropometry, so every visit shows real change.

Scheduling

Day, week, and list calendars for your visits. Everything you book shows up in your Google Calendar.

And the details that save you time

Meal plan templates

Save any plan as a template, start new plans from one, or copy a plan into next month.

Allergies up front

A patient's allergies and preferences sit right above the planner, so you always plan around them.

Print-ready plans

Print a clean copy of every week of the plan to hand to your patient.

ISAK anthropometry

Skinfolds, girths, and breadths, with body fat by Faulkner, Durnin-Womersley, or Jackson-Pollock, plus somatotype.

Drag to reschedule

Move a visit by dragging it on the week view, and mark it completed, cancelled, or no-show in a click.

What needs attention

Your dashboard shows upcoming visits, missed visits, expired plans, and labs waiting for review.

Built for teams

Invite dietitians and staff by email. Patients are shared across your practice, each with an assigned dietitian.

Change history

Every change to a patient's record is logged automatically, and each practice's data is kept separate.

Simple enough to start today

Three steps from a new patient to visible progress.

  1. 1

    Add your patient

    Create a clinical record in minutes: demographics, conditions, allergies, and preferences.

  2. 2

    Build their meal plan

    Lay out a one-month plan on a weekly grid, or start from a template, built around what they can and love to eat.

  3. 3

    Track progress every visit

    Log measurements and labs at each visit and watch the charts move.

See the whole picture

Real screens from Palato. The meal-plan grid and progress charts do the heavy lifting.

Palato meal-plan grid (preview)

A meal plan built around each patient

Breakfast to dinner, snacks included, on a weekly grid. Use the same plan every week or a different one for each, with the patient's allergies pinned on top. It saves as you type.

Palato progress charts (preview)

Progress you can actually see

Weight and BMI trends over time, and blood panels with reference ranges that flag anything out of range.

Early adopter pricing

Simple pricing that grows with your practice

Subscribe now and keep this price for as long as you stay subscribed.

Practice
Billing

Prices in USD, plus applicable tax.

Free

All access, up to 5 active patients

$0
Free forever. No card needed.

Basic

For tracking patients and meal plans

$24.99/ month
  • Unlimited patients
  • Records, measurements, labs and goals
  • Meal plans and templates
  • Print plans and records

Pro

Recommended

The full practice

$39.99/ month
Everything in Basic, plus:
  • Emails to patients (appointments, reminders, meal plans, visit summaries)
  • Meal plan PDFs sent by secure link
  • Google Calendar and integrations
  • Patient portal

Compare Basic and Pro

Free includes everything in Pro for up to 5 active patients.

FeatureBasicPro
Active patientsUnlimitedUnlimited
Records, measurements and ISAKIncludedIncluded
Labs and goalsIncludedIncluded
AppointmentsIncludedIncluded
Meal plans and templatesIncludedIncluded
ImportIncludedIncluded
PrintIncludedIncluded
Emails to patientsNot includedIncluded
Meal plan PDFs by secure linkNot includedIncluded
Google Calendar and integrationsNot includedIncluded
Patient portalNot includedIncluded

An active patient was added, seen, measured or given a meal plan in the last 90 days, or has an upcoming appointment.

Early adopter pricing: subscribe during early access and keep these prices, for every plan and extra nutritionist, while you stay subscribed. If your subscription ends, current prices apply when you come back.

Sales tax is added at checkout.

Questions, answered

Be first to try Palato.

Join the waitlist for early access and a founding perk. No spam, ever.

Early access. No spam. Unsubscribe anytime.